Here is the vermin and poison ivy infested unimproved wasteland. (ok vermin infested is an exaggeration, but there is poison ivy)
March 19th, 2006
You can see the crater that Dan Rose sort of dug out. This a very rough cut. The measurements are good for the playcenter.
April 1st, 2006
Dad (the foreman of the job) suggested we dig holes and use sakrete to stabilize the structure. It is very stable.
April 24th
Dan smoothed down the surrounding property, delivered peastone for the surface and spread loam.